About Us
Projects
Reports
Forest Company Information
How You Can Help
News and Press Releases
Links and Photos
Findings: Culverts
The major reason for culvert failure was the materials utilised in their construction. The Standard Logging Agreement states:
"Logs with earth and fill shall not be used for culvert construction."(SLA, Clause 14)
This was a common means of culvert construction and impoundments upstream of the culverts were almost ubiquitous. Poor construction techniques and inadequate allowance for water and sediment flows have permitted the sediment and logging debris carried in the waterway diverted through the culvert to completely block flow under the road. The environmental consequences of this impeded flow is obvious. Blocked culverts defeat the very purpose for which they were constructed under the roads throughout all logging areas.
